Is plug-in solar legal in Michigan?

✓ Last verified: November 23, 2026

No plug-in solar law yet in Michigan — bill pending

Michigan has not enacted a plug-in solar law. A bill — Plug-in photovoltaic system bill (amends 2008 PA 295, adding Sec. 115) — HB 5764 — is still alive as of November 23, 2026, but a pending bill changes nothing until it passes and takes effect. Until then, the default rules under "What applies today" are the ones that apply.

Plug-in PV system up to 1,200 W via a standard 120 V outlet, UL or equivalent NRTL certification (UL 3700 not named), NEC compliance and anti-islanding; exempt from distributed-generation and interconnection requirements; customer must notify the electric provider within 30 days after installation on an MPSC form.

Legislative status

StatusBill pending — no law yet
BillPlug-in photovoltaic system bill (amends 2008 PA 295, adding Sec. 115) — HB 5764
Bill statusIn committee
Last checkedNovember 23, 2026

103rd Legislature (2025-2026). Introduced Mar 19, 2026 by Rep. Will Snyder and referred the same day to the House Committee on Energy. Trackers checked Nov 15, 2026 found no hearing, committee vote, or floor action since; advocates were still petitioning the chair for a hearing in fall 2026. The Legislature remains in session, so the bill had not formally died at the check date.

What applies today

Without a state plug-in solar law, a system that feeds power into a home's wiring is treated like any other grid-connected generator: it is governed by the utility's interconnection rules and the electrical code. In practice, that means a plug-in kit that backfeeds through a wall outlet is generally not permitted without an interconnection agreement and listed equipment. The plug-in solar laws tracked on this site exist to create a simpler exception to that default — and Michigan does not have one yet.

The legal alternative available today: a solar panel charging a portable power station that never feeds power into your home wiring. The panels charge the battery and you run devices from the battery, so no interconnection is involved and no plug-in solar statute is needed.

What an 800 W kit could save where it is legal

Plug-in solar is not legal in Michigan yet, so this is a what-if for comparison only — not a saving you can claim here today: at an average residential electricity price of 22.99¢/kWh (EIA, August 2026) and 4 peak sun hours a day, an 800 W kit would generate about 993 kWh a year and save about $183 a year if 80% of the power is used in the home as it is generated. Open the savings calculator set to Michigan.

Run your situation through the legality checker, and see how states with a law handle product certification on the UL 3700 tracker.

Frequently asked questions

Is plug-in solar legal in Michigan?

Not yet. Michigan has no plug-in solar law in force as of November 23, 2026. A bill (Plug-in photovoltaic system bill (amends 2008 PA 295, adding Sec. 115) — HB 5764) is pending, but a pending bill does not make plug-in solar legal — it has to pass and take effect first.

Is there a plug-in solar bill in Michigan?

Yes — Plug-in photovoltaic system bill (amends 2008 PA 295, adding Sec. 115) — HB 5764. Its status as of November 23, 2026: in committee. The legislative status section above tracks where it stands.

When might plug-in solar become legal in Michigan?

Only after the bill passes and is signed, plus any delay before the effective date written into its text. There is no guaranteed date; we re-check this page as the bill moves — it was last verified November 23, 2026.

What is the legal alternative in Michigan today?

The widely available option is a solar panel charging a portable power station that never feeds power into your home wiring: the panels charge the battery, and you run devices from the battery. Because nothing is fed back into the wiring, it does not need a plug-in solar statute, and it works in Michigan today.

Sources

Last verified November 23, 2026 against the legislature records and trackers linked here:

General information, not legal advice. Confirm against your utility's current interconnection rules before plugging anything in.